The design process began with the criteria needed including a sauna and steam room. This was to be a contemporary gym with all the latest equipment.
Initial ideas were produced using our design flare and the client’s requirements, a 3d design and full walkthrough were created. Everything down to the handles, taps and coat hooks were selected and work on this half a million project began. Site work was held to a tight 3 month schedule staring with an empty shell and utilising all our sister company including Sovereign Signs and Pearlgreen Engineering. The outcome being a high spec state of the art gym.